
Textile Industry
Optimize your operations with cogeneration in the textile industry. Save costs and energy with efficient turbines.
Successful Implementations
Aguascalientes, México
Consumption
3,845,640
100%
Generation
3,764,615
97.89%
Demand
45,394,320
100%
Avoided Billed Demand
3,764,615
33%
Installed Equipment
4 C65 Turbines
Fuel
Natural gas
Result
98% savings in energy consumption
DTC Solutions and the textile industry joined forces to reduce costs with environmental benefit. 4 Capstone C65 Turbines were installed to cover 100% of electrical consumption.
Monterrey, Nuevo León
Consumption
1,628,484
100%
Generation
1,252,680
76.92%
Installed Equipment
2 C65 Turbines
Fuel
Natural gas
Result
76% savings in energy consumption
3 Capstone C65 Turbines were installed to generate savings on the electricity bill and take advantage of residual heat from drying ovens.
Want similar results?
Contact us for a personalized energy diagnosis for your industry